Project Title Description Start Date End Date Unit Status

Webfocus Upgrade

Upgrade of the existing 7.X version to the most current 8.X which offers enhanced functionality.

June 2013

July 2013 

Applications

Future project

Datamart 

Applying all 2013 enhancements which will capture data for all non-permanent employees giving management the ability to analyze data which aid decision making.

December 2012

July 2013

Applications

In progress

Workflow Upgrade 

Complete install of new version that will enhance the performance of the workflows, provide updated browser support, online accessibility tool tip etc.

July 2013

August 2013 

Applications

Future project

Xtender Upgrade

Install version 6.X containing enhancements for sensitive field masking capabilities, easily reordering pages in web access portal among other security features.

July 2013

August 2013

Applications

Future project

Butler Data Center Reorganization Project

Reorganize servers/telecom racks, install security cameras, and setup guest login

September 2012

July 2013

Networking

In progress

Science and Technology Data Center Project

 

Install security cameras and guest login, oversee purchasing/installation of operator’s room furniture and monitors, and oversee floor cleanup

October 2012 

TBD (Additional funding pending)

Networking

In progress

Science and Technology Center for Defense and Homeland Security Project

 

Providing technical consultation to the general contractor, Facilities, and Dr. Curtis Charles for the space during design and construction phase

 October 2012

July 2013

Networking

In progress

Butler Video Teleconferencing Project

 

Providing design consultation and installation to Dr. Lewis and Dr. Herring in upgrading their existing video conferencing system

February 2013

June 2013

Networking
Media Services  

In progress

Cook Quad Backbone Fiber Replacement Project  

 

Overseeing replacement of main backbone fiber that was cut during the Cook Quad Restoration construction project.

September 2012

June 2013

Networking

In progress

Digital Signage Project

 

Assisting Jon Parsons and Facilities with design and installation of campus-wide digital signage

March 2013

TBD by Facilities (Jon Parsons)

Networking

In progress

Campus Wide Fiber Infrastructure Project

Upgrading existing campus fiber to all buildings

January 2014

TBD (pending funding)

Networking

Future project

Campus Wide Underground Project (Directional Boring / Duct Banks)

Overseeing the repairing of all damaged ductbanks

September 2013

TBD (pending funding)

Networking

Future project

Lyons Science Room 203 Computer Lab Renovation Project (Dr. Rakesh)

 

Installing new computer lab for Dr. Rakesh

May 2013

May 2013

Networking

Completed
May 2013

Student Center Renovation Project

 

Overseeing technical aspects of the RSJC renovation project, and installing network and wireless equipment

March 2013

March 2015 (tentative)

Networking

In progress

Wireless Coverage Improvement Project

 

Conducting campus-wide wireless building surveys, installing additional wireless arrays, and reshaping wireless signal in an effort to provide additional coverage.

September 2013
(pending funding) 

 

Networking

Future project

Campus Telephone System Replacement

 

Replacing obsolete Nortel phone system with new Cisco Unified Communications System

September 2013 
(pending funding) 

 

June 2014

Networking

Future project

Dorm Switch Refresh

 

Replacing Enterasys switches with Cisco switches in all campus residence halls

January 2014
(pending funding)  

March 2014

Networking

Future project

Campus IP Subnet Change

 

Complete the move from public IP addressing to private IP addressing

June 2013

August 2013

Networking

Future project

Main ASA/Firewall Configuration Cleanup

 

Removing old and inactive configurations from firewall

June 2013

July 2013

Networking

Future project

Remote ASA/Firewall Firmware Upgrades

 

Upgrade all remote firewalls firmware

June 2013

June 2013

Networking

Future project

ACS Upgrade

 

Upgrading our secure authentication server to latest version

May 2013

May 2013

Networking

Future project

PCI Compliance Installs

 

Installing ASA/firewalls to isolate and protect the Cashiers office and the Infirmary from a security breach, and to comply with HIPPAA and PCI

June 2013

June 2013

Networking

Future project

Campus Switch Refresh

Replace all Cisco 3750 stack switches with Cisco 2960 switches

January 2014
(pending funding) 

June 2014

Networking

Future project

Windows x64 Image

Create Windows x64 image

May 2013

Fall Semester 2013

Media Services

Future project

Campus standard PC Models

Choose campus PC standards. Publish purchasing method.

May 2013

June 2013

Media Services

Future project

Tablet Standard and Image

Create tablet standard and images. 

April 2013

May 2013

Media Services

In progress

Software Licencing Inventory 

Create inventory for managing software licenses for better tracking.

Pending funding 

Media Service

Future project

Update Cycle for Campus Computers

Create update / patch management process / cycle for campus computers

May 2013

July 2013

Media Services

In progress

Update Cycle for Virtual Desktops

Create update / patch management process / cycle for virtual desktop environment

August 2013

Media Services

Future project

Streamline Software Purchases

Streamline software purchases for Adobe and other products.

Waiting funding approval

 

Media Services 

Future project

Science & Technology smart classroom project:

Currently working with six different vendors on solutions to implement new smart classroom technology.

Waiting funding approval

Waiting funding approval

Media Services

Future project

Human Resources Conference Room Project

Select vendor and plan for installation of smart classroom technology in HR conference room.

May 2013

August 2013 

Media Services

Future project

Smart Room Project

Repair all the damaged screens, replace out of date projectors, replace bulbs, update podium computers (hardware and software upgrades), replace broken screen switches, configure old podiums to work with the new Pixie controller and retro fit for HDMI or Digital use.

May 2013

November 2013

Media Services

In progress

Classroom Interactive Software project

Find teaching tool for faculty to allow them to teach more effectively and to interact with the students in the classroom.

June 2013

August 2013

Media Services

Future project

Broncos Email upgrade from Outlook to Office 365

Microsoft is upgrading our students email service from Outlook to Office 365, which will provide Fayetteville State University students tools to prepare coursework, create sophisticated reports and presentations.

May 2013

August 2013

Systems 

In progress

Windows Update Server Services Installation/Configuration

Systems team will be setting up a Windows Server Update Service which will enable us to deploy product updates to computers running domain joined Windows OS on Fayetteville State University campus network. We are also researching ways to perform said updates through Symantec Altiris.

July 2013

September 2013 (tentative)

Systems

Future project

ClassClimate upgrade

ClassClimate is the software used to provide students w/ paper and online questionnaires (scantrons). New upgrade needs to be applied to the ClassClimate server.

Waiting on users to provide date of install

Pending

Systems

In progress

Configure/Install Linux Server for Computer Science

Systems team will be setting up a new Linux environment for the Computer Science department for programming activities. This will involve installation of a dedicated server in the DMZ, multiple compilers, transferring years of data off the current environment and etc.

June 2013

October 2013 (tentative)

Systems

Future project

Unified Computing System (UCS) install and migration of existing servers to new architecture

UCS is a data center architecture that combines computing, networking and storage resources into a single entity to enable centralized management and increase efficiency. Fayetteville State University is in the process of installing and configuring two UCS setups, one in each Data Centers, Science & Tech and Butler for an active/active UCS configuration, respectively. Upon completion of testing, Production VMWare servers will be moved to the UCS environment creating an Independent Production Private Cloud (IPPC) environment and Test environment.

March 2013

August 2013

Systems

In progress

NetApp Optimization Project

Fayetteville State University is utilizing multiple NetApps on campus for its storage needs. The Systems team will be working w/ a NetApp consultant to optimize our current setup, to bring all in line w/ Best Practices, as well as, to institute new data store policies and to consolidate all NetApps on campus.

June 2013

July 2013

Systems

Future project

SyncSort Installation for Disaster Recovery

Fayetteville State University working w/ UNC General Administration Support Staff will be installing and configuring SyncSort on campus for our Production data to be replicated to MCNC Western Data Center, as well as to archive to tape on campus.

July 2013

August 2013 (tentative)

Systems

Future project

Public Name Servers implementation

Fayetteville State University is in the process of moving our domain controllers out of public view and access and moving to dedicated public name servers.

March 2013

June 2013

Systems

Completed
May 2013

Windows 8/ Windows server 2012 compatibility Implementation

Installation of windows 2012 server as domain controllers, allowing for windows 8 systems domain access, support and configuration.

May 2013

October 2013

Systems

Completed
May 2013

Upgrading current Exchange architecture

Systems team will be upgrading our current Exchange environment from Exchange 2007 to Exchange 2013, utilizing new advancements in the Microsoft Exchange arena, including but not limited to Anti-malware protection, Integration w/ SharePoint and Lync, Unified Messaging and Integration w/ Microsoft Outlook @ EDU which will create a Private/ Public Cloud configuration.

May 2013

November 2013

Systems

Future project

Inventory of Technology @ Fayetteville State University Campus

Systems team is researching different software applications, as well as, already purchased software to help in ascertaining the desktop technology that exists on campus, to achieve true visibility as to what exists, where it exists and who is the primary user. This includes desktops, phones and mobile tablets.

May 2013

October 2013

Systems

In progress

Re-implement current Citrix (FSU Virtual Office) environment

Systems will be re-implementing/upgrading our current Citrix environment so as to include the latest versions of the applications offered as well as to provide a better user experience.

July 2013

September 2013

Systems

Future project

Setup ‘true’ DMZ environment

Utilizing Best Practices configure a DMZ environment for Fayetteville State University which will provide a physical and logical subnet network that contains only external facing services to the Internet so as to provide an additional layer of security and segregate our internal network from external.

May 2013

October 2013

Systems

In progress

Setup ‘true’ Test environment

Upon completion of the UCS project and NetApp Optimization Projects we will be setting up an independent Test environment w/ its own SAN, utilizing pre-existing hardware.

April 2013

October 2013 (tentative)

Systems

In progress

Virtualization of legacy OpenVMS servers

In the process of virtualizing legacy servers running OpenVMS which hosts pre Ellucian Banner data and systems to a virtual environment, ensuring a more stable hardware platform as well as offering better disaster recovery.

January 2013

July 2013

Systems

In progress

Ad Astra Upgrade

: Fayetteville State University utilizes Ad Astra as our official campus calendar for scheduling Events and Classes. Individuals in Systems team will be upgrading it to a newer version to add more functionality to the application.

July 2013

July 2013

Systems

Future project

Upgrade CORE cashiering application

Systems team working with CORE Business Technology and Business Office have installed an upgrade of the CORE cashiering system in a Test environment which is being tested by users. The upgrade provides added functionality to the existing application to benefit users.

December 2012

June 2013

Systems

In progress

Blumen application/database installs

Systems team working with Upward Bound and subunits therein for tracking prospective academic students.

February 2013

April 2013

Systems

Completed
April 2013

Upgrade VMWare Virtual Desktop Infrastructure

Systems team will be installing and configuring new higher specced ESX servers for the Virtual Desktop Infrastructure on campus. The new servers will be on the newest version of ESX and would provide the campus w/ a better VDI experience. The installation and configuration will include but not limited to upgrading the vcenter for the VDI, upgrading the NetApp plugin and migration to the new NetApp.

July 2013

September 2013

Systems
Media Services 

Future project

Enhance online Microsoft Office Suites Training materials into Interactive Training Tutorials

Change current PowerPoint version of Microsoft Office Suites training materials for Excel, Word, PowerPoint, and Outlook (Beginner, Intermediate, and Advanced) into interactive tutorials using Adobe Captivate, with automatic web submit notification of completion to the Training Coordinator.

November 2012

August 2013

Training

In progress

Create mandatory iCloud services workshop and iPad Agreement Policy

Creating a Getting Started iPad Basics training workshop coving Basic iPad use, creating an Apple ID, iCloud Account Set-up, and iPad Security.  Two forms of the workshop will be created; online print version along with an interactive tutorial.

Creating an iPad Agreement Policy for iPad users stating the responsibilities and restrictions for use.

March 2013

May 2013

Training

In progress

Migrate Website Content to New CMS Migrate all sites on www, alumni, finaid, and library subdomains from Serena Collage CMS  to new Ingeniux CMS.

May 2012 

March 2013

Web Services

Completed
March 2013

Migrate and rebuild Academic Catalog Migrate existing static content from Serena Collage CMS to Ingeniux CMS. Rebuild schemas and components for dynamic content.

April 2013

June 2013

Web Services

Completed
May 2013

Decommission old CMS servers With the completion of migration of the Academic Catalog, the Collage application and database servers will be decommissioned.  

June 2013

Web Services

Completed
May 2013

2013-2014 Edition of Academic Catalog Revisions and preparation for new edition of academic catalogs in cooperation with undergraduate and graduate catalog officers.

May 2013

August 2013

Web Services

In progress

Upgrade Ingeniux CMS and migrate production web server Upgrade from 7.5 to Ingeniux CMS 8 in new server environment

June 2013

August 2013

Web Services

Future project

Configure off site web server Work with MCNC to add web server in existing off site environment. Set up Ingeniux CMS to publish content to MCNC for a fully functioning fail over website.

April 2013

August 2013

Web Services
& Systems

In progress

Integrate Ingeniux CMS with Digital Measures Set up a webservice to integrate with Digital Measures for dynamically generated faculty bio pages on departmental websites.

August/September 2013

October 2013

Web Services

Future project

Configure forms and slide rotator apps in CMS Implement and configure forms and slide rotator apps for use in departmental websites.

October 2013

October 2013

Web Services

Future project

Fayetteville State University1200 Murchison Road • Fayetteville, NC 28301 • 910.672.1111
Copyright © • A Constituent Institution of The University of North CarolinaContact Us