| Project Title | Description | Start Date | End Date | Unit | Status |
|
Webfocus Upgrade |
Upgrade of the existing 7.X version to the most current 8.X which offers enhanced functionality. |
June 2013 |
July 2013 |
Applications |
Future project |
|
Datamart |
Applying all 2013 enhancements which will capture data for all non-permanent employees giving management the ability to analyze data which aid decision making. |
December 2012 |
July 2013 |
Applications |
In progress |
|
Workflow Upgrade |
Complete install of new version that will enhance the performance of the workflows, provide updated browser support, online accessibility tool tip etc. |
July 2013 |
August 2013 |
Applications |
Future project |
|
Xtender Upgrade |
Install version 6.X containing enhancements for sensitive field masking capabilities, easily reordering pages in web access portal among other security features. |
July 2013 |
August 2013 |
Applications |
Future project |
|
Butler Data Center Reorganization Project |
Reorganize servers/telecom racks, install security cameras, and setup guest login |
September 2012 |
July 2013 |
Networking |
In progress |
|
Science and Technology Data Center Project
|
Install security cameras and guest login, oversee purchasing/installation of operator’s room furniture and monitors, and oversee floor cleanup |
October 2012 |
TBD (Additional funding pending) |
Networking |
In progress |
|
Science and Technology Center for Defense and Homeland Security Project
|
Providing technical consultation to the general contractor, Facilities, and Dr. Curtis Charles for the space during design and construction phase |
October 2012 |
July 2013 |
Networking |
In progress |
|
Butler Video Teleconferencing Project
|
Providing design consultation and installation to Dr. Lewis and Dr. Herring in upgrading their existing video conferencing system |
February 2013 |
June 2013 |
Networking |
In progress |
|
Cook Quad Backbone Fiber Replacement Project
|
Overseeing replacement of main backbone fiber that was cut during the Cook Quad Restoration construction project. |
September 2012 |
June 2013 |
Networking |
In progress |
|
Digital Signage Project
|
Assisting Jon Parsons and Facilities with design and installation of campus-wide digital signage |
March 2013 |
TBD by Facilities (Jon Parsons) |
Networking |
In progress |
|
Campus Wide Fiber Infrastructure Project |
Upgrading existing campus fiber to all buildings |
January 2014 |
TBD (pending funding) |
Networking |
Future project |
|
Campus Wide Underground Project (Directional Boring / Duct Banks) |
Overseeing the repairing of all damaged ductbanks |
September 2013 |
TBD (pending funding) |
Networking |
Future project |
|
Lyons Science Room 203 Computer Lab Renovation Project (Dr. Rakesh)
|
Installing new computer lab for Dr. Rakesh |
May 2013 |
May 2013 |
Networking |
Completed May 2013 |
|
Student Center Renovation Project
|
Overseeing technical aspects of the RSJC renovation project, and installing network and wireless equipment |
March 2013 |
March 2015 (tentative) |
Networking |
In progress |
|
Wireless Coverage Improvement Project
|
Conducting campus-wide wireless building surveys, installing additional wireless arrays, and reshaping wireless signal in an effort to provide additional coverage. |
September 2013 |
|
Networking |
Future project |
|
Campus Telephone System Replacement
|
Replacing obsolete Nortel phone system with new Cisco Unified Communications System |
September 2013
|
June 2014 |
Networking |
Future project |
|
Dorm Switch Refresh
|
Replacing Enterasys switches with Cisco switches in all campus residence halls |
January 2014 |
March 2014 |
Networking |
Future project |
|
Campus IP Subnet Change
|
Complete the move from public IP addressing to private IP addressing |
June 2013 |
August 2013 |
Networking |
Future project |
|
Main ASA/Firewall Configuration Cleanup
|
Removing old and inactive configurations from firewall |
June 2013 |
July 2013 |
Networking |
Future project |
|
Remote ASA/Firewall Firmware Upgrades
|
Upgrade all remote firewalls firmware |
June 2013 |
June 2013 |
Networking |
Future project |
|
ACS Upgrade
|
Upgrading our secure authentication server to latest version |
May 2013 |
May 2013 |
Networking |
Future project |
|
PCI Compliance Installs
|
Installing ASA/firewalls to isolate and protect the Cashiers office and the Infirmary from a security breach, and to comply with HIPPAA and PCI |
June 2013 |
June 2013 |
Networking |
Future project |
|
Campus Switch Refresh |
Replace all Cisco 3750 stack switches with Cisco 2960 switches |
January 2014 |
June 2014 |
Networking |
Future project |
|
Windows x64 Image |
Create Windows x64 image |
May 2013 |
Fall Semester 2013 |
Media Services |
Future project |
|
Campus standard PC Models |
Choose campus PC standards. Publish purchasing method. |
May 2013 |
June 2013 |
Media Services |
Future project |
|
Tablet Standard and Image |
Create tablet standard and images. |
April 2013 |
May 2013 |
Media Services |
In progress |
|
Software Licencing Inventory |
Create inventory for managing software licenses for better tracking. |
Pending funding |
Media Service |
Future project |
|
|
Update Cycle for Campus Computers |
Create update / patch management process / cycle for campus computers |
May 2013 |
July 2013 |
Media Services |
In progress |
|
Update Cycle for Virtual Desktops |
Create update / patch management process / cycle for virtual desktop environment |
August 2013 |
Media Services |
Future project |
|
|
Streamline Software Purchases |
Streamline software purchases for Adobe and other products. |
Waiting funding approval |
|
Media Services |
Future project |
|
Science & Technology smart classroom project: |
Currently working with six different vendors on solutions to implement new smart classroom technology. |
Waiting funding approval |
Waiting funding approval |
Media Services |
Future project |
|
Human Resources Conference Room Project |
Select vendor and plan for installation of smart classroom technology in HR conference room. |
May 2013 |
August 2013 |
Media Services |
Future project |
|
Smart Room Project |
Repair all the damaged screens, replace out of date projectors, replace bulbs, update podium computers (hardware and software upgrades), replace broken screen switches, configure old podiums to work with the new Pixie controller and retro fit for HDMI or Digital use. |
May 2013 |
November 2013 |
Media Services |
In progress |
|
Classroom Interactive Software project |
Find teaching tool for faculty to allow them to teach more effectively and to interact with the students in the classroom. |
June 2013 |
August 2013 |
Media Services |
Future project |
|
Broncos Email upgrade from Outlook to Office 365 |
Microsoft is upgrading our students email service from Outlook to Office 365, which will provide Fayetteville State University students tools to prepare coursework, create sophisticated reports and presentations. |
May 2013 |
August 2013 |
Systems |
In progress |
|
Windows Update Server Services Installation/Configuration |
Systems team will be setting up a Windows Server Update Service which will enable us to deploy product updates to computers running domain joined Windows OS on Fayetteville State University campus network. We are also researching ways to perform said updates through Symantec Altiris. |
July 2013 |
September 2013 (tentative) |
Systems |
Future project |
|
ClassClimate upgrade |
ClassClimate is the software used to provide students w/ paper and online questionnaires (scantrons). New upgrade needs to be applied to the ClassClimate server. |
Waiting on users to provide date of install |
Pending |
Systems |
In progress |
|
Configure/Install Linux Server for Computer Science |
Systems team will be setting up a new Linux environment for the Computer Science department for programming activities. This will involve installation of a dedicated server in the DMZ, multiple compilers, transferring years of data off the current environment and etc. |
June 2013 |
October 2013 (tentative) |
Systems |
Future project |
|
Unified Computing System (UCS) install and migration of existing servers to new architecture |
UCS is a data center architecture that combines computing, networking and storage resources into a single entity to enable centralized management and increase efficiency. Fayetteville State University is in the process of installing and configuring two UCS setups, one in each Data Centers, Science & Tech and Butler for an active/active UCS configuration, respectively. Upon completion of testing, Production VMWare servers will be moved to the UCS environment creating an Independent Production Private Cloud (IPPC) environment and Test environment. |
March 2013 |
August 2013 |
Systems |
In progress |
|
NetApp Optimization Project |
Fayetteville State University is utilizing multiple NetApps on campus for its storage needs. The Systems team will be working w/ a NetApp consultant to optimize our current setup, to bring all in line w/ Best Practices, as well as, to institute new data store policies and to consolidate all NetApps on campus. |
June 2013 |
July 2013 |
Systems |
Future project |
|
SyncSort Installation for Disaster Recovery |
Fayetteville State University working w/ UNC General Administration Support Staff will be installing and configuring SyncSort on campus for our Production data to be replicated to MCNC Western Data Center, as well as to archive to tape on campus. |
July 2013 |
August 2013 (tentative) |
Systems |
Future project |
|
Public Name Servers implementation |
Fayetteville State University is in the process of moving our domain controllers out of public view and access and moving to dedicated public name servers. |
March 2013 |
June 2013 |
Systems |
Completed |
|
Windows 8/ Windows server 2012 compatibility Implementation |
Installation of windows 2012 server as domain controllers, allowing for windows 8 systems domain access, support and configuration. |
May 2013 |
October 2013 |
Systems |
Completed |
|
Upgrading current Exchange architecture |
Systems team will be upgrading our current Exchange environment from Exchange 2007 to Exchange 2013, utilizing new advancements in the Microsoft Exchange arena, including but not limited to Anti-malware protection, Integration w/ SharePoint and Lync, Unified Messaging and Integration w/ Microsoft Outlook @ EDU which will create a Private/ Public Cloud configuration. |
May 2013 |
November 2013 |
Systems |
Future project |
|
Inventory of Technology @ Fayetteville State University Campus |
Systems team is researching different software applications, as well as, already purchased software to help in ascertaining the desktop technology that exists on campus, to achieve true visibility as to what exists, where it exists and who is the primary user. This includes desktops, phones and mobile tablets. |
May 2013 |
October 2013 |
Systems |
In progress |
|
Re-implement current Citrix (FSU Virtual Office) environment |
Systems will be re-implementing/upgrading our current Citrix environment so as to include the latest versions of the applications offered as well as to provide a better user experience. |
July 2013 |
September 2013 |
Systems |
Future project |
|
Setup ‘true’ DMZ environment |
Utilizing Best Practices configure a DMZ environment for Fayetteville State University which will provide a physical and logical subnet network that contains only external facing services to the Internet so as to provide an additional layer of security and segregate our internal network from external. |
May 2013 |
October 2013 |
Systems |
In progress |
|
Setup ‘true’ Test environment |
Upon completion of the UCS project and NetApp Optimization Projects we will be setting up an independent Test environment w/ its own SAN, utilizing pre-existing hardware. |
April 2013 |
October 2013 (tentative) |
Systems |
In progress |
|
Virtualization of legacy OpenVMS servers |
In the process of virtualizing legacy servers running OpenVMS which hosts pre Ellucian Banner data and systems to a virtual environment, ensuring a more stable hardware platform as well as offering better disaster recovery. |
January 2013 |
July 2013 |
Systems |
In progress |
|
Ad Astra Upgrade |
: Fayetteville State University utilizes Ad Astra as our official campus calendar for scheduling Events and Classes. Individuals in Systems team will be upgrading it to a newer version to add more functionality to the application. |
July 2013 |
July 2013 |
Systems |
Future project |
|
Upgrade CORE cashiering application |
Systems team working with CORE Business Technology and Business Office have installed an upgrade of the CORE cashiering system in a Test environment which is being tested by users. The upgrade provides added functionality to the existing application to benefit users. |
December 2012 |
June 2013 |
Systems |
In progress |
|
Blumen application/database installs |
Systems team working with Upward Bound and subunits therein for tracking prospective academic students. |
February 2013 |
April 2013 |
Systems |
Completed |
|
Upgrade VMWare Virtual Desktop Infrastructure |
Systems team will be installing and configuring new higher specced ESX servers for the Virtual Desktop Infrastructure on campus. The new servers will be on the newest version of ESX and would provide the campus w/ a better VDI experience. The installation and configuration will include but not limited to upgrading the vcenter for the VDI, upgrading the NetApp plugin and migration to the new NetApp. |
July 2013 |
September 2013 |
Systems |
Future project |
|
Enhance online Microsoft Office Suites Training materials into Interactive Training Tutorials |
Change current PowerPoint version of Microsoft Office Suites training materials for Excel, Word, PowerPoint, and Outlook (Beginner, Intermediate, and Advanced) into interactive tutorials using Adobe Captivate, with automatic web submit notification of completion to the Training Coordinator. |
November 2012 |
August 2013 |
Training |
In progress |
| Create mandatory iCloud services workshop and iPad Agreement Policy |
Creating a Getting Started iPad Basics training workshop coving Basic iPad use, creating an Apple ID, iCloud Account Set-up, and iPad Security. Two forms of the workshop will be created; online print version along with an interactive tutorial. Creating an iPad Agreement Policy for iPad users stating the responsibilities and restrictions for use. |
March 2013 |
May 2013 |
Training |
In progress |
| Migrate Website Content to New CMS | Migrate all sites on www, alumni, finaid, and library subdomains from Serena Collage CMS to new Ingeniux CMS. |
May 2012 |
March 2013 |
Web Services |
Completed |
| Migrate and rebuild Academic Catalog | Migrate existing static content from Serena Collage CMS to Ingeniux CMS. Rebuild schemas and components for dynamic content. |
April 2013 |
June 2013 |
Web Services |
Completed |
| Decommission old CMS servers | With the completion of migration of the Academic Catalog, the Collage application and database servers will be decommissioned. |
June 2013 |
Web Services |
Completed |
|
| 2013-2014 Edition of Academic Catalog | Revisions and preparation for new edition of academic catalogs in cooperation with undergraduate and graduate catalog officers. |
May 2013 |
August 2013 |
Web Services |
In progress |
| Upgrade Ingeniux CMS and migrate production web server | Upgrade from 7.5 to Ingeniux CMS 8 in new server environment |
June 2013 |
August 2013 |
Web Services |
Future project |
| Configure off site web server | Work with MCNC to add web server in existing off site environment. Set up Ingeniux CMS to publish content to MCNC for a fully functioning fail over website. |
April 2013 |
August 2013 |
Web Services |
In progress |
| Integrate Ingeniux CMS with Digital Measures | Set up a webservice to integrate with Digital Measures for dynamically generated faculty bio pages on departmental websites. |
August/September 2013 |
October 2013 |
Web Services |
Future project |
| Configure forms and slide rotator apps in CMS | Implement and configure forms and slide rotator apps for use in departmental websites. |
October 2013 |
October 2013 |
Web Services |
Future project |