Project Name: Rudolph Jones Student Center Renovation and Expansion
Closing Date: October 20, 2011
Project Description: Provide project planning, programming, design and engineering services for renovation of existing 69,000 sf and addition of 40,000 sf to the student center. Functions currently in the student are food service, post office, card office, office and meeting spaces. It is planned to increase food service, add the bookstore, ballroom/conference spaces, and other student related functions. Minimum LEED Silver certification. Budget = $22M
For detailed information click here.
Commissioning Solicitation Advertisements
Fayetteville State University (FSU) is accepting proposals for a Commissioning Team for Rudolph Jones Student Center Renovation and Expansion until 5:00 PM on October 20, 2011 in the Facilities Management Office, Fayetteville State University, 1200 Murchison Road, Fayetteville, NC 28301. This project is for renovation of existing 69,000 SF and addition of 40,000 SF to the student center. Functions currently in the student are food service, post office, card office, office and meeting spaces. It is planned to increase food service, add the bookstore, ballroom/conference spaces, and other student related functions with an estimated construction budget of $17,000,000. It is planned that the building will be LEED Silver. The commissioning team will provide services to comply with both North Carolina Senate Bills 668 and 1946, and with Fundamental and Enhanced Commissioning requirements as defined in the USBGC LEED Rating System version 3.0. The team may also be utilized for envelope commissioning and to provide other related services. The selected team will work closely with the architects and the CM @ Risk to deliver a fully commissioned building that provides optimum energy efficiency, indoor air quality, occupant comport and minimal operation and maintenance costs. Proposals shall be limited to 20 pages (8½ X 11). Submit FIVE(5) copies of the response in the following format: Tab 1: Executive Summary; Tab 2: Project Team Organization; Tab 3: Pre-construction and Construction Plan; Tab 4: Similar Project Experience; Tab 5: LEED experience; Tab 6: Minority Business Participation Plan.
For detailed information click here.
Fayetteville State University is accepting proposals for a Construction Manager at Risk for Student Center Renovation and Expansion until 5:00 PM on October 20, 2011 in the Facilities Management Office, Fayetteville State University, 1200 Murchison Road, Fayetteville, NC 28301. This project is for renovation of existing 69,000 SF and addition of 40,000 SF to the student center. Functions currently in the student are food service, post office, card office, office and meeting spaces. It is planned to increase food service, add the bookstore, ballroom/conference spaces, and other student related functions with an estimated construction budget of $17,000,000. It is planned that the buildings will be LEED certified. Firms should have experience in renovation, construction of food service, retail, and conference facilities, LEED certification, and Building Information Modeling (BIM). Proposals shall be limited to 20 pages (8 1/2X11). Submit FIVE copies of the response in the following format: Tab 1: Executive Summary; Tab 2: Project Team Organization; Tab 3: Pre-construction and Construction Plan; Tab 4: Similar Project Experience with this team; Tab 5: LEED experience; Tab 6: Minority Business Participation Plan.
There will be a MANDATORY PRE-PROPOSAL MEETING on 10/10/2011 at 2:30 PM in Lyons Science Annex, Room 120.
For detailed information click here.
Project Description: Annual Open-ended Service Agreement for Design and Engineering Services during 2011-2012. Services for small projects on an as-needed basis for the disciplines listed below. Each project budget (includes design, construction and contingency) is not to exceed $500,000.
1. Architectural Design
2. Civil and Structural Engineering
3. Environmental and Hazardous Materials Engineering
4. Landscape Architectural Design
5. Mechanical, Electrical, Plumbing, Commissioning and Fire Protection Engineering
6. Special Inspections and Testing Engineering
Critical Selection Factors: Interested firms can participate in the process by submitting a current SF-254 Form (one original only) and addressing the following in a written proposal. Please note that only one copy of the proposal is requested and the length should be limited to five (5) pages (Exclusive of the SF 254 Form). Firms are requested to assure receipt of proposals at address listed below by 5:00 PM, September 14, 2011. Note: In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.
1. Experience and expertise with similar projects, highlighting projects with the UNC System and other North Carolina state agencies
2. Past performance on similar projects
3. Adequate staff with appropriate experience and training
4. Historically Underutilized Business (HUB) and/or Minority Business Enterprise (MBE) representation
5. Availability and proximity to the Campus
Designer Selection Process: Following the receipt of proposals, a University Selection Committee will shortlist, possibly interview and make a recommendation of selection to the Chancellor and University Board of Trustees.
Questions: Contact Mabel Campion at 910-672-1431 or mcampion@uncfsu.edu
Proposal Submittal: Fayetteville State University
Facilities Management- Planning & Construction
Attn: Open-ended Service Agreements
1200 Murchison Road
Fayetteville, NC 28301
|
RFQ Advertising Date |
Wednesday June 29, 2011 |
|
Submittal of RFQ (deadline) |
Monday July 11, 2011 |
|
Notification |
Friday July 29, 2011 |
|
Request for Proposals Advertising Date |
Wednesday, August 17, 2011 |
|
Submittal of RFP (deadline) |
Friday, September 9, 2011 |
|
Interviews |
Tuesday, September 27, 2011 |
|
Selection |
Tuesday, October 4, 2011 |
Project Description:
The Fayetteville State University Development Corporation (FSUDC) in Fayetteville, North Carolina invites developers to submit Qualifications to develop a privately financed, designed, built and marketed mixed-use development to be located on Washington Drive in close proximity to the Fayetteville State University (FSU) campus. For more information click here
Project Scope:
The FSUDC and <?XML:NAMESPACE PREFIX = ST1 />
Project Site:
The Washington Drive Mixed Use Development Project site is located between Murchison Road and Bragg Boulevard, near the southwestern tip of the FSU campus The site is less than a mile north of downtown Fayetteville.
Project Schedule:
RFQ Advertising Date Wednesday June 29, 2011
Submittal of RFQ (deadline) Monday July 11, 2011
Selection Process:
A short-list of selected candidates from the submittals of Statement of Qualifications will be invited on July 15, 2011 to participate in a Request for Proposal (RFP) with specific development vision for the sites.
Questions/Proposal Submittal:
All responses to this RFQ must be received before 5:00 pm on Monday July 11, 2011 at the following location:
Office of Facilities Management / Planning, Design & Construction
Phone (910) 672-1431
The Statement of Qualifications shall be delivered in a sealed envelope and clearly labeled:
“Statement of Qualifications
Any response to this RFQ received after this time and date shall not be considered. No telephone, facsimile, or electronic submittal of qualifications shall be considered. Materials forwarded by mail should allow adequate time for delivery to ensure timely receipt on or before the deadline.
Developer and / or team members should not communicate with any of the Fayetteville State University Trustees or any other party at
Emily M. Dickens, Esq.
Director of Government and Community Affairs
Office of the Chancellor
Phone: (910) 672-2101
Email: edickens@uncfsu.edu